Arabia Saudita
LOCAL CONTRACTOR WINS SAUDI WATER PIPELINE EPC DEAL
The local Mutlaq Al-Ghowairi Contracting Company (MGC) has secured the engineering, procurement and construction (EPC) contract for the Jubail-Buraydah independent water transmission pipeline (IWTP) project in Saudi Arabia. The project will link Jubail in the kingdom’s Eastern Province and Buraydah in the Qassim region over a 587-kilometre (km) pipeline that can transmit 650,000 cubic metres a day (cm/d) of water. Key components of the project include two main pumping stations located in Jubail and Al-Qulaib, a 587km carbon steel pipeline and a dual-direction flow system that allows for water transfer from Jubail to Al-Shimasiyah and in reverse through Al-Qulaib. The project also includes a water storage component, with 11 strategically located reservoirs in Jubail, Al-Shimasiyah and other sites. The reservoirs will have a combined storage capacity of 1.63 million cubic metres. In March that Saudi Water Partnership Company (SWPC) had signed a contract agreement to develop and operate Saudi Arabia’s second IWTP project. It will have a total cost of $2.2bn. A developer team comprising local companies Aljomaih Energy & Water, Nesma Company and Buhur for Investment Company was named as the preferred bidder for the contract in November last year. The team proposed to develop the Jubail-Buraydah IWTP project for $0.958 a cubic metre. The Jubail-Buraydah IWTP project is larger than the kingdom’s first IWTP linking Rayis and Rabigh, which a consortium including the local Alkhorayef Water & Power Technologies Company and Spain’s Cobra Instalaciones y Servicios will develop and operate at a cost of $2bn. The project is part of the kingdom’s National Water Strategy 2030, which aims to reduce the water demand-supply gap and ensure desalinated water accounts for 90% of the national urban supply, to reduce reliance on non-renewable ground sources. (ICE RIYADH)
Fonte notizia: Meed